(2021) Duplication of National Route No. 5 UY (49 km)

Service area

Engineering

Services

Geometric Design, Soil Movement, Pavement Design and Signage and Road Safety, Soil and Defléctometrics Studies

Client

Ramón C. Álvarez S.A.

Counterpart

Ing. Miguel Lacroze (RCA) / DNV - MTOP

Date

September 2021 - November 2023

Location

Durazno, Uruguay

Actual state

Finished


Download File

Object:

Ramón C. Álvarez S.A. hires CDS Ingenieros to carry out the executive project for the duplication of National Route No. 5 of the DNV sections 119 to 123, 49 km.

Scope of services:

The scope and components of each of them are detailed below:

  • Topographic survey.
  • Soil Studies for the Road Project.
  • Executive Engineering:
    • Geometric road design of the duplication (route, rest areas, returns, population centers).
    • Pavement design for both new construction and rehabilitation.
    • Uneven pedestrian passages.
    • Storm drains throughout the project.
    • Preliminary project of the lighting works.
    • Footage and technical requirements for the construction of the work and maintenance.

Technical team:

  • Project Director: Eng. Nelson Pintos.
  • Road designer: Eng. Silvina Frajmowicz, Eng. Catalina Stirling, Eng. Álvaro López, AT Juan Carlos del Real, AT José Cantero.
  • Hydraulic designer: Eng. Andrea Pintos & Dica y Asociados.
  • Structures: Ingenium SRL
  • Architecture: OPA Arquitectos
  • Lighting: Barbot-Rocha Studio.
  • Topography: 4D Engineering.
  • Soil Studies: CDS Ingenieros.