We are in the final stages of the Executive Project of what will be the first section to be built of the Duplication of Route 5, from 133k300 (south of Sarandí Grande) to 182k700 (Route 14 Roundabout south of the City of Durazno) .
The new road will go to the west of the existing one and, for the first time in Uruguay, loopbacks specially designed for this purpose will be implemented, spaced every 5km.
With this first project, the criteria to be used in the other sections to be duplicated were defined.
We carry out the projects of: road geometric design, pavement design, BIM modeling, road safety and signaling, hydraulic design and lighting of junctions and returns.