Service area
Engineering
Services
Road, stormwater, and related infrastructure project
Client
Consortium Grupo Vial del Este
Counterpart
Ing. José Luis Franzini
Date
October, 2013 – February, 2014
Location
Maldonado - Rocha, Uruguay
Actual state
Finished
Object:
In accordance with the call “11008-O02-VIA-ETE-001-R0—Internal Roads, Truck Parking, and Biomass Yard” issued by the company Alcoholes del Uruguay S.A., the following executive projects were carried out:
• Internal roads of the development.
• Truck parking area.
• Biomass storage yard (logs and chips).
Scope of services:
The scope of the services covered the road and stormwater infrastructure projects of the development, with the following scope:
• Pavement design based on traffic information from the construction and project stages as defined by the owner.
• Economic evaluation of possible paving alternatives.
• General layout of internal roads, with maneuver verification according to the most restrictive design vehicle indicated by the owner.
• Longitudinal and cross-sectional project profiles.
• Resolution of intersections between the internal streets of the development.
• General stormwater layout with elevation of collectors.
• Descriptive and calculation reports.
• Documentation for bidding, including:
»» Specific technical specifications.
»» Office base budget.
Technical team:
Project Manager: Eng. Nelson Pintos
Road Designer: Eng. Diego Nollenberger and Eng. Nelson Pintos
Subcontracts:
Lighting: Barbot-Rocha Studio
Drainage: Eng. Pablo Fitermann