Español English

(2022) Duplication of National Route No. 9 UY (104 km)

Service area

Engineering

Services

Roads, Hydraulics, Road Safety and Signage, Lighting, Topography, and Soil Studies

Client

Consortium Grupo Vial del Este

Counterpart

Eng. Marcelo Paternostro (GVE) / DNV - Roads Division

Date

June 2022 - December 2023

Location

Maldonado - Rocha, Uruguay

Actual state

Finished


Download File

Object:

The consortium Grupo Vial del Este (GVE) has contracted CDS Ingenieros for the Executive Project of the Duplication of National Route No. 9 between Progressives 105K650 and 210K000 – Pan de Azúcar to Rocha, 104 km.

Scope of services:

The scope of the contracted work included:

  • Topographic Survey
  • Soil Studies for the Road Project
  • Executive Road Project:
    • Geometric design
    • Design of interchanges and turnarounds
    • Structural design of pavements
    • Design of signage and road safety
    • Lighting design for interchanges and turnarounds
  • Hydraulic Project:
    • Hydraulic modeling of 18 bridges
    • Hydrological and hydraulic design of culverts

Technical team:

  • Project Manager: Eng. Diego Nollenberger
    Project Coordinator: Eng. Álvaro López
    Project Designers: Eng. Álvaro López, Eng. Silvina Frajmowicz, Eng. Andrea Pintos, Eng. Joaquín García Pintos, Eng. Catalina Stirling, Tech. José Cantero, Tech. Juan Del Real
    Soil Studies: CDS Ingenieros Laboratory
    Subcontracts:

    • Architecture: OPA Arquitectos
    • Lighting: Estudio Barbot-Rocha
    • Topography: Ingeniería 4D
    • Bridge Hydraulic Design: Eng. Ángel Vale
WhatsApp