Service area
Engineering
Services
Roads, Hydraulics, Road Safety and Signage, Lighting, Topography, and Soil Studies
Client
Consortium Grupo Vial del Este
Counterpart
Eng. Marcelo Paternostro (GVE) / DNV - Roads Division
Date
June 2022 - December 2023
Location
Maldonado - Rocha, Uruguay
Actual state
Finished
Download File
Object:
The consortium Grupo Vial del Este (GVE) has contracted CDS Ingenieros for the Executive Project of the Duplication of National Route No. 9 between Progressives 105K650 and 210K000 – Pan de Azúcar to Rocha, 104 km.
Scope of services:
The scope of the contracted work included:
- Topographic Survey
- Soil Studies for the Road Project
- Executive Road Project:
- Geometric design
- Design of interchanges and turnarounds
- Structural design of pavements
- Design of signage and road safety
- Lighting design for interchanges and turnarounds
- Hydraulic Project:
- Hydraulic modeling of 18 bridges
- Hydrological and hydraulic design of culverts
Technical team:
- Project Manager: Eng. Diego Nollenberger
Project Coordinator: Eng. Álvaro López
Project Designers: Eng. Álvaro López, Eng. Silvina Frajmowicz, Eng. Andrea Pintos, Eng. Joaquín García Pintos, Eng. Catalina Stirling, Tech. José Cantero, Tech. Juan Del Real
Soil Studies: CDS Ingenieros Laboratory
Subcontracts:
- Architecture: OPA Arquitectos
- Lighting: Estudio Barbot-Rocha
- Topography: Ingeniería 4D
- Bridge Hydraulic Design: Eng. Ángel Vale